-
Co-Op Quality Sign Fitting
Local Somerfields has just changed to Co_Op 2 week refit and already the tape overlapping some of the internal cladding panels is peeling away.
Couldn’t resist sharing this quality fitting. Sorry the pic was at night on my way home.
There is a low wall with a crash barrier in front of it as the wall runs along side the river. The timber fence is on the other side of the river about 8ft away. Not enough visible wall for the panel, obviously missed when surveyed 🙄
Solution just use the 2 fixings at the bottom and have the Di_Bond panel waving in the breeze. I hope nobody leans on it and it bends with them going face first into the river.
Sorry, there were no replies found.
Log in to reply.